Planning Division Weekly Updates

Aug 19, 2019 - Aug 25, 2019


Planning Division

City Hall
330 West 20th Avenue
San Mateo, CA 94403
 
Ph: (650) 522-7212
Fx: (650) 522-7201
planning@cityofsanmateo.org
 
8:00 a.m. - 5:00 p.m.
Monday, Wednesday,
Thursday, Friday

12:30 p.m. - 5:00 p.m.
 Tuesday

Planning Commission

Next Meeting:
August 27, 2019 @ 7:00 pm
Council Chambers

PA18-010 Underground Flow Equalization System (UFES)

PA-2018-010
Underground Flow Equalization System (UFES)
The project consists of a new underground wastewater holding structure, pump station, odor control equipment room and diversion pipelines. During significant storms, diversion pipelines would route excess wastewater to the holding structure until it can be pumped back into the sanitary sewer collection system. Only minor appurtenances, including access hatches, an electrical building and vents for treated air would be at or above the ground surface. The Planning Commission will hold a Study Session at City Hall Council Chambers on Tuesday, August 27, 2019 at 7:00pm. Study Session items are for discussion purposes only, No Vote is taken.

Noticing

Pending Zoning Administrator Decisions & Other Notices
(Click the Notice to view) 

PA-2019-024 / 2661 Hacienda St., SFDDR

PA-2019-024 / 2661 Hacienda St., SFDDR
Single Family Dwelling Design Review (SFDDR) for a 444 square-foot second-story addition to an existing two-story, split-level single family dwelling. The addition is proposed above the existing one-story portion of the structure.


PA-2019-035 / 525 Costa Rica Ave., SFDDR Modification

PA-2019-035 / 525 Costa Rica Ave., SFDDR Modification
Single Family Dwelling Design Review (SFDDR) Modification to a previously approved planning application
(PA-2018-007) for a second story addition and a new detached two-car garage. The modifications include a revised exterior design with a shed-roofed front porch, standing seam metal roofing, and elimination of the originally approved second-story balcony. No change to the originally approved floor area is proposed.

What's Happening in Development and City Planning?

Monte Diablo Ave. & N. Kingston St. SPAR PA-2019-008 /

PA-2019-008 /
Monte Diablo Ave. & N. Kingston St. SPAR
The Planning Commission held a Study Session at City Hall Council Chambers on Tuesday, August 13, 2019. Study Session items are for discussion purposes only,
No Vote was taken. The proposed project consists of the demolition of the existing on-site structures and the construction of 35 townhomes, totaling 80,526 gross square feet. The project includes 85 parking spaces.


PA19-005 Hayward Park Project, Pre-App

PA-2019-005 / Hayward Park Project
A Neighborhood Meeting was held on July 31, 2019 at the San Mateo Marriott. The Neighborhood Meeting Minutes Summary have been upload to the project page.

Planning Resources

SKIP THE LINE!

Citizen Self Service (CSS) Portal

Citizen Self Service (CSS) Portal
Track Permits, Planning Applications, Inspections, Code Enforcement Cases, Business Tax Records and more on our City website. Visit the link below for more information.

 

Property Information Report

Property Information Report
Look up Zoning Designation, Lot Size, Floor Area Ratio, and Height Limits on our City website. Visit the link below for more information.

 

Accessory Dwelling Unit (ADU) and Junior Accessory Dwelling Unit (JADU)

Accessory Dwelling Unit (ADU) and
Junior Accessory Dwelling Unit (JADU)
Look up guidelines and additional information for Accessory Dwelling Units and Junior Accessory Dwelling Units. Visit the link below for more information. 

Strive San Mateo 2040 General Plan

Strive San Mateo - General Plan 2040

Studying San Mateo's Future

 
The City Council took an important step in our ongoing efforts to guide the future of San Mateo through the General Plan Update. Based on community feedback collected over the last few months, 11 geographical areas where chosen to undergo a comprehensive study of how these parts of the city might change over the next 20 years. Staff and Planners will gather more community input on what kinds of changes the public would like to see – such as transportation improvements, additional housing, streetscape enhancements and more. A range of alternatives will then be studied for each of the 11 areas to evaluate the potential impacts and benefits, before a preferred plan for each area is chosen.

The study areas include downtown, along El Camino Real, near Caltrain stations, the Bridgepointe Shopping Center and other segments of the City.

Another round of community workshops and public meetings will be held in the coming months and everyone is encouraged to participate and learn more by visiting the Strive San Mateo website at www.StriveSanMateo.org 

 

City Council

Next Meeting:
September 3, 2019 @ 7:00 pm
Council Chambers

 


IF YOU ARE INTERESTED IN OTHER PROJECTS IN SAN MATEO
visit our What's Happening page.
 

Powered by
CivicSend - A product of CivicPlus