Gramercy Drive Subdrain Improvement Project

Project overviewGramercy Drive project zone

The Gramercy Drive Subdrain Improvement Project anticipates installing a pipe to help drain water that could be penetrating the soil under the roadway. Once the subdrain is installed, we anticipate following up with roadway rehabilitation in the same area to prevent further water penetration. All improvement work will require a closure of the northbound traffic lane. One-way traffic control will be required during construction. Access to driveways will be maintained during each phase.

Anticipated Schedule

Installation of the subdrain is anticipated to begin late spring 2020 and roadway rehabilitation will follow in the summer. Schedule is subject to change. Area residents will receive a mailed notification once the project is approved. 

Status - March 2020

As we prepare for awarding the construction contract, utilities are currently being located under the roadway. This information is critical to the success of the project.