Rand Street Reconstruction Project

Public Works is reconstructing Rand Street from Shoreview Avenue to Dakota Avenue, a Measure S project. 

UPDATE:

The City of San Mateo is coordinating with the California Water Service Company (Cal Water) for repair of its water main on Rand Street. 

Cal Water will return to the community Aug. 6 to complete service lateral connections and tie-ins to the repaired water main. Its component of the repair work is expected to be completed Aug. 14. City pavement reconstruction contractors are expected to resume the interrupted road work project thereafter, we anticipate that date to be the week of Aug. 19.  

Granite Construction, the contractor executing the road reconstruction project, will then resume its work for approximately five to six weeks.

Scope of Work:

This project consists of reconstruction of the pavement section, overlay of five inches of new asphalt concrete pavement, the repair of concrete curbs, gutters, sidewalks and driveway approaches to maintain stormwater surface runoff along the street.

"Street Reconstruction" generally includes the removal of all existing asphalt surfacing, excavation of the road subgrade materials, and utility relocation work as necessary. The road is re-built from the bottom up, with new aggregate base and new asphalt concrete pavement.

Light Outage:

Starting June 5, 2019, Rand Street from Shoreview Avenue to Newbridge Avenue will experience street light outage during infrastructure improvements. Street light outage is anticipated to continue through this project delay. 

Map of Planned Street Reconstruction

Rand St Map

Benefits of Work:

  • New street surface (Shoreview Ave to Dakota Ave)
  • Improved sidewalks, curbs, and gutter to assist stormwater runoff

Impacted Areas:

  • Road Construction: Rand Street from Shoreview Avenue to Dakota Avenue
  • Street light outage: Rand Street from Shoreview Avenue to Newbridge Avenue

Background:

The contract for the reconstruction work was awarded by City Council on August 20, 2018. A public outreach meeting was held at City Hall on September 5, 2018 to discuss construction impacts, and work is planned to begin at the start of October 2018.

City of San Mateo Contacts:

Mario Ung, Senior Engineer
Phone: 650-522-7315
Email Mario Ung

Jimmy Vo, Construction Manager
Phone: 650-522-7319
Email Jimmy Vo