Return HomePrint PageEmail PageRSS Feeds

Go To Search
 
Sign Up for Email Updates!
Email Updates
Sign up to have all the important information sent direct to your Inbox! 
Sign Up Today!
 
Contact the City
Contact the City
From the City Clerk to the Waste Water Treatment Plant - all the
phone numbers you're looking for!
27.86 Recycling Collection Areas

Sections:

    27.86.010   Purpose.

    27.86.020   Scope.

    27.86.030   Development standards.

    27.86.040   Guidelines.

    27.86.050   Review.

 

 

     27.86.010   PURPOSE.  This chapter is intended to establish procedures and regulate the establishment of recycling collection areas in development projects.  (Ord. 1994-18 § 1 (part), 1994).

 

     27.86.020   SCOPE.  For the purposes of this chapter a "development project" is defined as any habitable commercial, institutional, marina, recreational structure, or residential development having five or more living units, or single family residential projects where solid waste is collected and/or loaded in a common location serving five or more units.  This chapter shall apply to the following "development projects":

    (a)  Any new development project, or additions to existing development projects which individually or cumulatively add thirty percent or more floor area within a 12-month period.  In cases where projects add thirty percent (30%) or more floor area to an existing development project, regulations for recycling collection areas shall apply to all uses and the entire development project.

    (b)  To individual tenants within an existing development project occupied by multiple tenants in which tenant improvements individually or cumulatively add thirty percent (30%) or more to the floor area of the tenant's business within a 12-month period.  (Ord. 1994-18 § 1 (part), 1994).

 

     27.86.030   DEVELOPMENT STANDARDS.  The following minimum development standards shall apply to all new recycling collection areas.

    (a)  The design, construction, and location of recycling collection areas shall not conflict with local laws relating to fire, building, access, transportation, circulation or safety.

    (b)  Outdoor recycling areas must have bins or containers that provide protection against adverse environmental conditions.

    (c)  Adverse impacts such as noise, odor, vectors, or glare shall be mitigated through adequate separation, fencing, landscaping and maintenance.

    (d)  Areas for recycling shall be adequate in capacity, number and distribution to serve the needs of the occupants' of the development project.  Site design must include adequate space for recycling and garbage containers and access for recycling/garbage collection trucks.  The recycling/garbage collection area enclosures shall be located on level ground.

    (e)  Dimensions of the recycling collection area shall accommodate the number and type of containers needed for both garbage and recycling receptacles sufficient to meet the recycling needs of either the development project for new developments, or the individual tenant for expansion projects.  (Ord. 2009-7 § 45, 2009; Ord. 1996-8 § 1 (part), 1996; Ord. 1994-18 § 1 (part), 1994).

 

     27.86.040   GUIDELINES.  The City Council may adopt guidelines to assist in the implementation of this Chapter.  (Ord. 1994-18 § 1 (part), 1994).

 

     27.86.050   REVIEW.  Review for compliance with this Chapter shall be made by the Zoning Administrator.  (Ord. 1994-18 § 1 (part), 1994).

 


CivicPlus Content Management System © 1997- CivicPlus. All rights reserved.
All content © 2006- San Mateo, CA and its representatives. All rights reserved.