Short Description of Project:

The Department of Public Works is implementing a street reconstruction project at 39th Avenue from Pacific Boulevard to Curtiss Street.

This project consists of “street reconstruction” of pavement section up to 24 inches in depth from lip of gutter to lip of gutter; ovelay 4.5 inches of asphalt concrete pavement; install traffic speed hump; install wheelchair ramps where applicable; repair concrete curb & gutter, driveway approach and sidewalk as necessary to maintain stormwater surface runoff within the project limits.

“Street Reconstruction” - Generally includes the removal of all existing asphalt surfacing, excavation of the road subgrade materials, and utility relocation work as necessary.  The road is re-built from the bottom-up, with new aggregate base and new asphalt concrete pavement.

Completed Work:

As a prerequisite of the Street Reconstruction Project, the City of San Mateo authorized utility companies to perform utility relocation work in advance of the street reconstruction work.  In August to November 2016, utility companies had substantially completed the utility relocation work.  Site restoration work is ongoing pending on-site conditions.

Upcoming Work:

Street Reconstruction Work: Spring 2017

Benefits of Work: 

-      New street pavement (Pacific Boulevard to Curtiss Street)
-      Adding Wheelchair Access Ramps
-      Improve sidewalk, curb and gutter, as necessary to assist stormwater runoff

 
Impacted Areas:
39th Avenue – Pacific Boulevard to Curtiss Street

City of San Mateo: Elton Yee, Assistant Engineer
Phone: (650) 522-7320
Email:





San Mateo City Hall – 330 West 20th Avenue, San Mateo, CA 94403

CivicPlus Content Management System © 1997- CivicPlus. All rights reserved.
All content © 2006- San Mateo, CA and its representatives. All rights reserved.