North Central Pedestrian Improvement Project
Project 
North Central Pedestrian Infrastructure Improvement Program

Project Area
The North Central Neighborhood

Project Description
Improved pedestrian crosswalks and enhanced pedestrian scale street lighting

Benefits
The proposed improvements will improve the resident’s quality of life by providing additional pedestrian amenities. These amenities include, but are not limited to, curb ramps for ADA accessibility, curb extensions/bulbouts to reduce the pedestrian crossing street width and provide added visibility, crosswalks to notify drivers to expect and yield to a pedestrian, advance stop bars to notify drivers to stop in advance of the crosswalk, pedestrian refuge islands for added pedestrian protection when crossing the street, and pedestrian scale lighting to illuminate the sidewalk and to combat safety issues.

Construction Timeline
Work is expected to take place from early 2014 to mid 2014

Work Hours
8:00 am to 5:00 pm, Monday through Friday

Expected Construction Impacts
Typical to most construction projects, you will experience the following impacts:
  • Temporary lane closures
  • Delays when traveling thru construction area
  • Limited access to driveway for brief periods
 
The selected contractor and the on-site construction inspector will work with residents on any short term impacts.

Project Manager
Jocelyn Walker
(650) 522-7331



CivicPlus Content Management System © 1997- CivicPlus. All rights reserved.
All content © 2006- San Mateo, CA and its representatives. All rights reserved.