San Mateo Executive Park PA11-072
 
Location: 3000 & 3155 Clearview Way
Assessor Parcel Numbers: 041-361-120
041-361-130
Applicant: Hanns Lee, Senior Vice President
Lowe Enterprises Real Estate Group
3155 Clearview Way
San Mateo, Ca 94402
(650) 341-7730
Description: The project includes the demolition of an existing 9,000 sq ft (approx) vacant building and construction of a new office building at the site of an existing executive office park complex located at 3000-3155 Clearview Way.  The proposed office building is three stories, approximately 100,000 sq ft, and 42 ft in height to the plateline.  The new office building may include an occupancy of up to approximately 480 employees.  An approximately 120,000 sq ft (net) above-grade five-level parking garage is also proposed with 666 spaces.  511 additional surface parking spaces will be provided.  Existing and proposed bike parking is provided on site.  Six new short term bike racks and six new long term double capacity bike lockers are proposed for the new office building.  The project site is approximately 22 acres.  Four fully occupied three-story office buildings are located on the site with one vacant building previously utilized as a restaurant.  Hours of operation are 8:00 am to 6:00 pm Monday-Friday as governed by tenant leases.  The existing buildings (approximately 270,000 gross sq ft) and site improvements are clustered within approximately 12.5 acres, preserving approximately 9.5 acres of open space on the site.  The removal of 39 heritage trees is proposed along with additional major vegetation (147 trees) predominantly categorized as existing ornamental parking lot trees.  Eighty-five replacement trees are proposed.
Status: 
A Planning Commission Public Hearing was held on Tuesday evening, February 12, 2013.  The Planning Commission approved the project with the incorporation of new conditions relating to improving pedestrian connections along the project frontage on West Hillsdale.  The Planning Commission also directed Public Works to investigate improving circulation at the intersection of Clearview Way and West Hillsdale to address concerns raised by residents of the Clearview HOA.  The AR and related attachments are available online: http://www.cityofsanmateo.org/index.aspx?NID=2526
Environmental
Document
 
The Initial Study / Negative Declaration is available for public review at the Planning Counter in City Hall during regular business hours and the Main Library reference desk, during reference library hours. 

Negative Declaration
Initial Study
Attachment 1: Project Plans
Attachment 2: Arborist Report
Attachment 3: Required Tree Planting Form, Tree Evaluation Schedule
Attachment 4: Design Review Report
Attachment 5: Greenhouse Gas Air Quality Report
Attachment 6: Watershed Assessment
Attachment 7: Stormwater Report
Attachment 8: Geotechnical Investigations
Attachment 9: Traffic Impact Analysis
Attachment 10: Trip Reduction Plan
Attachment 11: LEED Checklist
City Contact: For additional information, please contact the project planner, Christine Usher, at (650) 522-7215 or by email at .