Return HomePrint PageEmail PageRSS Feeds

Go To Search
 
Sign Up for Email Updates!
Email Updates
Sign up to have all the important information sent direct to your Inbox! 
Sign Up Today!
 
Contact the City
Contact the City
From the City Clerk to the Waste Water Treatment Plant - all the
phone numbers you're looking for!
Bay Meadows Current Information

Bay Meadows Transit-Oriented Development

PA #'s  PA07-054, PA07-055, and PA07-056
Date Revised: September 12, 2014
Location:  Primary Address:  2600 S. Delaware; includes various addresses & APNs.

The project site is approximately 83 acres.  The project site is located at the southern terminus of South Delaware Street and is bounded by Saratoga Drive and the Franklin Resources campus on the east, San Mateo County Event Center on the north, Caltrain rail corridor on the west, and the McLellan Avenue single family residential area on the south.
Developer Contact:  Genelle Osendorf, Wilson Meany
Embarcadero Center, Suite 3300
San Francisco, CA  94111

(415) 905-5300
Project Website:  www.baymeadows.com 
Description:  Past Site Development Permit & Site Plan and Architectural Review Planning Applications.

The Site Development Permit planning application for the site infrastructure (grading, street design, sidewalks utilities, street trees and street lights) and Vesting Tentative Subdivision Map was approved by the Planning Commission at the October 23, 2007 Planning Commission Meeting.

Three Site Plan and Architectural Review (SPAR) planning applications encompassing all but one block of the Bay Meadows Phase II development project were submitted in June 2007.  The 18th block (Mixed Use #1) is excluded because it includes the one acre site designated for below market rate units.  The 17 blocks were grouped into three planning applications based on land use and location for processing purposes.

This Approved Development Program map http://www.cityofsanmateo.org/DocumentCenter/View/41283 shows the approved development program on each block.
           
  • SPAR#1-Delaware Street blocks: Station Blocks, Mixed Blocks (excluding Mixed Use #1), Residential Block #7 (includes Town Square), and the Linear Park (9 Blocks).  Includes approximately 750,000 square feet of office space, approximately 93,000 square feet of retail/restaurant space, 392 residential housing units, the Town Square, the western portion of the View Corridor, and the Linear Park.

        The Planning Application was approved by the City Council at the April 21, 2008
        City Council Meeting.
               
  • SPAR#2-Southern Residential Blocks with a total of 330 single-family and multi-family residential units, the eastern portion of the View Corridor and Neighborhood Park (5 blocks).

        The SPAR 2 Planning Application was approved by the Planning Commission at the 
        October 14, 2008 Planning Commission Meeting.

             
SPAR#3-Northern Residential Blocks with a total of 344 multi-family residential units
              (3 Blocks).

The SPAR 3 Planning Application was approved by the Planning Commission at the December 9, 2008  Planning Commission Meeting.
Status:  Infrastructure construction consisting of the installation of new public streets, related utilities and street trees and lights commenced in September 2009 and was recently completed.  Not all of the accepted streets are open to the public at this time because there is no public access needed in this area.

Vertical construction on the project site is underway with townhomes on blocks, RES 2, RES 3 and RES 5 being built by TRI Pointe Homes and Shea Homes.  Occupancy of the first townhome units on RES 3 occurred in the summer of 2013.  Additionally, Nueva School opened for students on September 2, 2014.  A 108-unit apartment complex on RES 1 called "Field House" is underway and is anticipated to be completed by the end of 2014.  Construction of the first office building at Station Block #4 is anticipated to begin in September 2014 with the foundation permit issued on September 9, 2014.  Additionally, construction will begin on the Linear Park in fall 2014, which is the last of the three new public parks to be built at the site.

Additional construction information is available on the project website at www.baymeadows.com.  
City Contact:  For additional information regarding the planning applications, please contact the project planner, Darcy Forsell, at (650) 522-7209, or by email at .  
For construction related questions please contact the Building Division at (650) 522-7172. 

San Mateo City Hall – 330 West 20th Avenue, San Mateo, CA 94403

CivicPlus Content Management System © 1997- CivicPlus. All rights reserved.
All content © 2006- San Mateo, CA and its representatives. All rights reserved.